DiamondW Home
Home To The Trade Locations Products Become a Dealer
What's New What's New
Diamond W is the exclusive distributor for PERGO in tri-state area

Diamond W to house the Western Azrock Distribution Center

Diamond W moves to new, larger central distribution facility

 

Sun Paratech Hardwood Installation

Each carton of this flooring should be placed in the room in which it is to be installed at least 24 hours before installation. Do not open until ready to install.

The subfloor should be completely dry and level.
If this flooring is to be installed as a "floating floor" start by laying a thin layer of plastic foil to eliminate moisture penetration if installing over concrete. Next, lay a covering of foam. This will act as a cushion, and also as a sound barrier.

Please Note:
Wood is a natural product, and some color variation can occur. We recommend that each board should be checked for color uniformity before installation to ensure a pleasing result.

Installation as a "floating floor"

  • 1) Tools needed: Hammer, saw, square, ruler, plumb-line, pencil, adhesive, crowbar, small wedges and a tapping block.
  • 2) Be aware that there should be enough space between the door when installing floor.
  • 3) An expansion gap of 3/8" - 1/2" should be left around the perimeter of the floor and also around partitions or other fixed articles in the room.
  • 4) Begin from a straight, sound wall, with the groove of the first row of boards facing the wall. Use wedges between board and wall to obtain a gap of 3/8" - 1/2". Mark first row position with a plumb-line to ensure a straight line along the length of the wall.
  • 5) Cut the last piece in the row to size, and wedge the end of board to ensure a tight fitting joint. A continuous 1/8" bead of PVAC adhesive should be applied to the top of the groove.
  • 6) Begin the next row with the piece left over from the previous row. The distance between cross-joints should be at least 1 foot. using the tapping block as a striking block to wedge the boards together. Do not use excessive force. Remove any surplus glue with a damp cloth immediately.
  • 7) The final row will have to be sawn to the correct width (allowing 3/8" - 1/2".)
  • 8) Place the sawn board into its position and wedge tight with a crowbar or lever and wedges.
  • 9) Let the glue cure for at least 30 mins. before walking on the floor. Before nailing the skirting board in place, remove all wedges.



Super Flooring Compared to other types of flooring choics, laminate floors offer superior stain, burn, and indentation resistance.
 

Top of the Page
Contact
Information